How should the used tiles be packaged for shipment to Armstrong?

1. Material must be clean, dry and in the acceptable category above. No wood, metal or construction debris of any kind should be included.
2. Stack tiles on 4'x4' shipping pallets. Stack used tile 4' tall on the pallets. Secure tiles on pallets with stretch wrap or metal bands. You will need a pallet jack and possibly a forklift (depending on dock) to maneuver the loaded pallets.
3. All tiles should be straight on pallets and secured within the trailer so that there is no risk of loads falling during transit or when pallets are unloaded. Material must be wrapped tightly and packaged so that pallets remain stable.
4. If you have special loading or removal circumstances, please contact your Armstrong representative. We will be as flexible as possible to accommodate your project needs.
4 ft. x 4 ft. pallet
Vertically stacked two
(2) 4 ft. high pallets to
maximize trailer loads.



Many crews speed up the stacking by building a simple two-sided, free-standing frame. Note: Frame is not attached to pallet.
 